Guichang Molds Rack Warehouse Shelf for Moulds

Product Description

📋 Product Description
Product Name Metal rack for moulds
Item No. GMR-2.0
Material Steel
Finish Powder coated
Color Customized (Regular colors are green, white, orange, blue and matt grey)
Description Upright (single sided): 2000*600*60mm x 2pcs
Upright (double sided): 2000*600*65mm x 2pcs
Bottom frame: 900*600*50mm x 3pcs
Drawer layer: 900*600*75mm x 12pcs
Top layer with metal fence: 980*600*200 x 3pcs

Material:
Upright: 100*50*2.0C steel
Layer: 2.0mm
Track on upright: 3.5mm
Slide groove on drawer layer: 3.5mm

Other accessories:
8 screws (4 for fixing bottom frame and the other 4 for fixing top layer) for a main rack + 4 locating pins for a main rack + 2 back wires for 3 racks
Features 1. The top layer with metal fence can not be drawn out, it is fixed by screws on top.
2. The metal fence of top layer can be nondetachable (welded) and detachable, both we can do.
3. Every drawer layer is with 12mm upward bending on both sides to prevent mould from falling, it is also designed with decorative pattern for anti-skidding.
4. The drawer layers can be half-drawn out.
Size (L*W*H) L3100*W600*H2000 (1 main rack + 2 attached racks per 1 set)
Load Capacity 800kg/layer total 5 layers per rack
Application Storage rack for moulds in warehouse
Packing Bubble film for each upright, drawer, top layer and bottom frame. Other accessories are packed in a box or Customized.
MOQ 10 sets
Payment Terms Payment <= 3000USD, 100% in advance. Payment > 3000USD, 30% T/T in advance, balance before shipment.
Free sample Sample cost and freight fee will be charged. But the sample fee will be refund to you when we receive your first formal order. To get free sample, please contact our sales team.
Delivery time 20 days
Remarks Accepted ODM or OEM
🔍 Product Overviews
🏗️ Product Case
⚙️ Production Process
🏢 Factory Overview
📦 Related Products
We are a professional manufacturer focus on warehouse & supermarket storage racks. We have 20 years of R&D experience & over 10,000 square meters of factory area and more than 150 skillful staff members. We have introduced 4 automatic + 12 half-automatic production lines of welding, 10 rolling lines and 2 powder coating lines. By now our major product lines as below:
💡 Frequently Asked Questions (FAQ)
1. Are you a factory or a trading company?
We are a shelves manufacturing factory.
2. What’s your payment term and delivery time?
  • Payment <= 3000USD, 100% in advance. Payment > 3000USD, 30% T/T in advance, balance before shipment.
  • Irrevocable L/C at sight is acceptable.
  • EXW price & cash are also acceptable.
  • The delivery time is 18 days after the order is confirmed. Please check with our sales team for the exact date.
3. How are the goods packed?
Bubble film is used for the upright and beam, carton for the plate, or any other packing option upon the customer’s request.
4. What is your average production delivery time?
Around 15 days against formal order and deposit.
5. I’m not sure about your product, can you send me a sample for reference?
For sample orders, the sample cost and freight fee will be charged. However, when we receive your first formal order, the sample fee will be refunded to you.
6. I would like to have my own design products and the quantity is not that big, is it OK?
Yes, we can go with your customized design, regardless of whether the quantity is small or large. However, please understand that the cost may vary.
Click here for more information

Related Products